The overlapping felt creates a secondary barrier for moisture and wicks water away from the shingles above and the sheathing below.
Roofing felt paper overlap.
Felt roof underlayment 30 saturated roof felt.
Adjacent pieces of drip edge should overlap at least 2 inches 51 mm.
It also acts as a layer of insulation and water protection underneath roof shingles.
Atlas roofing provides a complete selection of roofing felt underlayment.
For a flat roof the same applies start at the lower end first working to the higher end and this should resemble tiles on a roof.
Remember to always overlap roof paper at valley ridges and hips by six inches.
Also called roof felt or builder s felt overlapped tar paper creates a water barrier that is your home s last line of defense against the elements if your shingles are damaged by wind hail or age.
Roofing felt or tar paper is infused with a petroleum based solution to provide an additional layer of roof protection under shingles.
Therefore a 2 inch overlap provides redundancy at the edges where the barrier is weakest.
Installing roofing paper or felt is an essential element to construct a waterproof roofing system.
The drip edge should extend at least 2 inches on the roof.
Roofing felt is required to overlap 2 inches over the lower felt course.
Work up the roof to the peak and fold felt over the top overlapping at least 3 inches and fasten it on both sides.
The roof felts are asphalt saturated and are manufactured with a high grade organic mat.
Do the other side of the roof the same way also with an overlap at the peak.
Install the roofing felt on all roof sides extending it over the ridge of the roof and overlapping 8 inches there just as you did on the sides.
As you work the paper can be tacked down in the center so it won t blow away.
Hence this is why tiles are fitted on top of each other rather than sideways.
Start at the bottom of the roofline and work up so any water that gets through the roofing material will shed down the tar paper and will not go under it.
Tip the roof ridge is the horizontal top edge which may or may not be present on a hip roof.
30 saturated felt underlayment is specified for use as an underlayment between the roof deck and the shingles.
The last layer should go over both sides of the roof overlapping both side covered in felt.